Desa campana de ventilación (V)DVC36(B)(H) Manual

Manuales PDF
20 Páginas Español

Desa campana de ventilación (V)DVC36(B)(H)
www.desatech.com
118197-01C8

There are two basic types of direct-vent in-
stallation:
• HorizontalTermination
• VerticalTermination

IMPORTANT: Horizontal square terminations
requireonlyinnerportionofwallrestop.Hori-
zontalinstallationsusingroundterminationrequire
exterior portionof wallrestop (see Figure14,
page10.
1. Setthereplaceinitsdesiredlocationanddeter-
minetherouteyourhorizontalventingwilltake.
Donotsecurethereplaceuntilallventinghas
beeninstalled.Someinstallationsrequiresliding
thereplaceinandoutofpositiontomakenal
ventingconnections.Figures14through18on
pages10through12showdifferentcongura-
tionsforventingwithhorizontalterminationthat
willhelpyoudecidewhichapplicationbestsuits
yourinstallation.Checktoseeifwallstudsor
roofraftersareinthepathofyourdesiredvent-
ingroute.Iftheyare,youmaywanttoadjustthe
locationofthereplace.
2. Directventpipesectionsandcomponentsare
designedwithspecialtwist-lockconnections.
Thefemaleendsofthe
pipeshave lockinglugs(indentations). These
lugswillslidestraightintomatchingslotson
themaleendsofadjacentpipes.Pushpipesec-
tionstogetherandtwistonesectionclockwise
approximatelyone-quarterturnuntilthesections
arefullylocked(seeFigure8).Note:Horizontal
runsofventmustbesupportedeverythreefeet.
Usewallstrapsforthispurpose.
3. Usea45° elbowto connectventing system
toreplaceuecollar.Theelbowisdesigned
to be twist-locked onto the flue collar as
described in step 2. IMPORTANT: Do not
attempttoalterthecongurationoftheelbow
bycutting,twisting,bending,etc.
4. Assemblethedesiredcombinationofpipeand
elbowstothereplaceuecollar.Ifthereare
longportionsofventingrun,pre-assembled
pipesectionsmaybeinstalledassubassem-
bliesforconvenience.
VENTINg INSTALLATION
INSTRUCTIONS
Continued
Figure 8 - Vent Pipe Connections
Female
Locking
Lugs
Male
Slots
(Framing
Detail)
10
3
/
4
"
10
3
/
4
" Inside Framing
10
3
/
4
"
8
1
/
2
"
Vent
O
pening
Combustible Wall
Vent Opening
Noncombustible Wall
Figure 9 - Vent Opening Requirements
Center of
Hole
5. Carefullydeterminethelocationwherethevent
pipeassemblywillpenetratetheoutsidewall.
Thecenteroftheholeshouldlineupwiththe
center-lineofthehorizontalventpipe.Markthe
wallfora10
3
/4"x10
3
/4"squarehole.Cutand
framethesquareholeintheexteriorwallwhere
theventwillbeterminated.Ifthewallbeing
penetratedis constructedof noncombustible
material,suchasmasonryblockorconcrete,
a 8
1
/2"holewithzeroclearanceisacceptable
(seeFigure9).
Manuales Relacionados para Desa campana de ventilación (V)DVC36(B)(H)